Notice and posting
Form 8551 has to reach CDPH at least five days before permanent abatement and hang at the site. CDPH’s guidance on that notice also covers telling residents, so ask the abatement firm who needs to be told and when.
Concord permits for exterior work
Bulletin IB-022 is Concord’s list of permit work for single-family and duplex homes. It names re-roofing, patio covers, room additions, windows and sliding glass doors; it says it is not complete, and it does not mention repainting. For siding, stucco repair or other exterior changes, phone the Building Division at (925) 671-3107 before you plan the job.
What affects the cost
Wall area and height, scaffolding, the surface (stucco, wood or trim), how much paint is failing, and whether the plan is stripping, covering or replacing all change the scope. Containment, waste handling and the CDPH notice add steps that an ordinary repaint does not have.
Frames count as exterior, which makes lead paint window and door work the next page. Read lead paint inspection and testing to learn which coats contain lead, or go back to Concord Lead Paint Removal.